We use cookies to ensure you get the best experience on our website. By continuing to use our site, you accept our use of cookies, privacy policy and terms of service.
04/2026 Edition · OIR-B1-1802 Compliant
Everything on the OIR-B1-1802 is here — roof coverings, deck attachment, nailing patterns, roof-to-wall connections, roof geometry, secondary water resistance, and opening protection. Wind speed pulls from the property address so you\'re not looking things up, and the math takes care of itself.
The editor follows the official form exactly. Nothing is missing, nothing is a workaround.
You fill in what you saw. Inspector Studio handles the lookups and the calculations.
Section 6 comes down to one question: what is that thing holding the truss to the wall, and does it count as a clip, a single wrap, or a double wrap? Get it wrong and the whole report is wrong. Inspector Studio keeps a reference library of roof-to-wall connectors right next to the question, so you can compare what's in front of you against what it actually is.
The library is a field reference to help you identify what you're looking at. It doesn't replace your judgment, the manufacturer's documentation, or the product approval on file — the determination on the form is always yours.
Roof coverings want a product approval number, a permit date, and an install year — three things that live on a permit you'd otherwise be hunting for in a county portal on your phone in someone's driveway. The property's permit history sits beside the section instead.
The Wind Mitigation editor is included in every Inspector Studio plan — no add-on fees.
Get Early Access